18-10-2014, 04:19 PM
The basic aim was to study the construction and testing of turbo generator (TG). The theoretical knowledge of Turbo Generator was tested practically. Main stress is given on the manufacturing and maintenance of Turbo Generators. Studied different processes like processes related to machine shop (shaping, drilling, boring, cutting etc.), Turbo Generator iron assembly, Turbo Generator rotor winding (how winding is housed on rotor shaft), exciter (how exciter is designed), Turbo Generator stator winding (how three phase winding is housed in slots on stator), Turbo Generator main assembly and test bed.