29-10-2014, 04:28 PM
Abstracts: Bottles, containers and packing strips etc. Is increasing day by day. As a result amount of wasteplastic also increases this leads to various problems. And the climate of india is not suitable for bitumen road. The formation of pot holes and penetration of water and bleeding are the coomon problems associated with asphalt pavement.to overcome this problem the use of plastic waste in asphalt pavement should be used.