09-11-2012, 11:05 AM
ELECTRICITY SCENARIO IN INDIA - 2012
ELECTRICITY SCENARIO.pptx (Size: 695.1 KB / Downloads: 38)
Power Sector development objectives:-
- Sufficient power to achieve GDP growth rate of 8%
- Reliable of power
- Quality power
- Optimum power cost
- Commercial viability of power industry
- Power for all
DETAILS FOR BLACKOUT
Weak Power Transmission System of Haryana Caused major blackout.
Excessive consumption by Haryana triggered the world’s biggest blackout
that left half of the india’s population without power for up to 24 hours
on July 31 2012
Haryana was overdrawing the power by 25.5 %, UP by 20.8 % and Punjab 5.5%
when Northern Grid Collapsed on July 30, 2012.
During the second blackout the Haryana was drawing 22.4 % excess power, but
UP had reduced its over drawls to 6.4 % and Punjab to 1.2 %.