The purpose of this review of value engineering is to examine the design of cooling and ventilation systems planned for the LHC high-luminosity project, the future update of the accelerator of large hadron colliders at CERN. Installation of refrigeration and ventilation equipment is planned between 2021 and 2024.
The review committee is invited to evaluate the proposed technical options with regard to requirements, including system availability, system integration status, and the preliminary installation schedule. A detailed analysis of resources is beyond the scope of the review; however, comments on the credibility of the plan, also with respect to the available resource, are welcome.
A file with the technical information on the current state of the design will be provided to panel members approximately one week prior to the review.
After the closure by the review chairman, the committee is required to compile a brief report with the findings, comments and recommendations within one month. The report will be delivered to Mauro Nonis, leader of the EN-CV group, and Lucio Rossi, leader of the HL-LHC project.
The review committee is invited to evaluate the proposed technical options with regard to requirements, including system availability, system integration status, and the preliminary installation schedule. A detailed analysis of resources is beyond the scope of the review; however, comments on the credibility of the plan, also with respect to the available resource, are welcome.
A file with the technical information on the current state of the design will be provided to panel members approximately one week prior to the review.
After the closure by the review chairman, the committee is required to compile a brief report with the findings, comments and recommendations within one month. The report will be delivered to Mauro Nonis, leader of the EN-CV group, and Lucio Rossi, leader of the HL-LHC project.