29-05-2012, 12:02 PM
HOTEL MANAGEMENT SYSTEM
HOTEL MANAGEMENT SYSTEM.doc (Size: 84 KB / Downloads: 203)
Abstract
Keeping this in mind “ Hotel name” is has been computerized we have been assigned the project of “Hotel Management”. The Project is an endeavor to improve efficiency in the process of registration time duration. How schema the allot and how much the time direction.
The above – mentioned process till date is totally manual leaching to transaction processing system has resulted in reasonable solution to current problem.
The after I Modified versions Modules, considering. The various validation check’s and security measures. Which are prerequisite of on-line system. It is apparent the besides in traducing efficient customer management, improved accuracy access to customer status etc. the new system relieve the concerned dept. of the redundant workload.
System Development Life Cycle
Analysis is the detailed study of the various operations performed by the system and their relationship within or outside the system. One aspect of analyzing the system is defining the boundaries of the system and determining whether or not a candidate.
System should consider other related system. During analysis, data are collection on all available files. Decision points, and transactions handled by the present system. Ones analysis is completed, the analyst has firm understanding of what is done.
Feasibility Study:
Is the project technically, operationally, financially and legally feasible? The feasibility is used to determine if the project should get the go-ahead. If the project is preceding the feasibility study will produce a project plane and budget estimates for the future stage of development.
Analysis:
Gather the requirements for the system. This stage includes details a detailed study of the business needs of the organization. Option for changing the business process may be considered.
Design:
This focuses on high level design (What programs are we going to need how are they going to interact), low level design (how the individual programs are going to work), interface design (what are the interfaces going to look like) and data design (what data are going to need).
Implementation:
The design is translated into code. Computer programs may be written using a conventional programming language to a fourth generation language (4GL) or an application generator.
Test:
The system is tested. Normally programs are written are as a series of individual modules-these should be subject to separate and detailed test. The system is then tested a whole- the separate modules are brought together and tested as complete system. the system need to be ensure that interfaces between modules work(integration testing), the system work on the intended platform and with the expected volume of data (volume testing) and the system does what the user requires(acceptance/beta testing).
Maintenance:
Inevitably the system will need maintenance-hopefully we haven’t got anything wrong but people will want extra things added or existing things changed over time.
This paradigm is the oldest and the most widely used approach to system development, it was developed by Royce in 1970.
CONCLUSION
This is a project for “HOTEL MANAGEMENT” it is a dummy project because due to the deficiency of actual information about Regulation.
Our Project can be extended we are unable to work more on this now because of lack of time. We will work more on it after some time we can make it useful for many other Regulation. We can add some sorting method in it. We also add some other facilities which help in it. We also can add some other facilities which help in formatting students enquiry. We can extend it for making records of marks etc. If we done this work also in our project we can sell it in market even as a self package.
HOTEL MANAGEMENT SYSTEM.doc (Size: 84 KB / Downloads: 203)
Abstract
Keeping this in mind “ Hotel name” is has been computerized we have been assigned the project of “Hotel Management”. The Project is an endeavor to improve efficiency in the process of registration time duration. How schema the allot and how much the time direction.
The above – mentioned process till date is totally manual leaching to transaction processing system has resulted in reasonable solution to current problem.
The after I Modified versions Modules, considering. The various validation check’s and security measures. Which are prerequisite of on-line system. It is apparent the besides in traducing efficient customer management, improved accuracy access to customer status etc. the new system relieve the concerned dept. of the redundant workload.
System Development Life Cycle
Analysis is the detailed study of the various operations performed by the system and their relationship within or outside the system. One aspect of analyzing the system is defining the boundaries of the system and determining whether or not a candidate.
System should consider other related system. During analysis, data are collection on all available files. Decision points, and transactions handled by the present system. Ones analysis is completed, the analyst has firm understanding of what is done.
Feasibility Study:
Is the project technically, operationally, financially and legally feasible? The feasibility is used to determine if the project should get the go-ahead. If the project is preceding the feasibility study will produce a project plane and budget estimates for the future stage of development.
Analysis:
Gather the requirements for the system. This stage includes details a detailed study of the business needs of the organization. Option for changing the business process may be considered.
Design:
This focuses on high level design (What programs are we going to need how are they going to interact), low level design (how the individual programs are going to work), interface design (what are the interfaces going to look like) and data design (what data are going to need).
Implementation:
The design is translated into code. Computer programs may be written using a conventional programming language to a fourth generation language (4GL) or an application generator.
Test:
The system is tested. Normally programs are written are as a series of individual modules-these should be subject to separate and detailed test. The system is then tested a whole- the separate modules are brought together and tested as complete system. the system need to be ensure that interfaces between modules work(integration testing), the system work on the intended platform and with the expected volume of data (volume testing) and the system does what the user requires(acceptance/beta testing).
Maintenance:
Inevitably the system will need maintenance-hopefully we haven’t got anything wrong but people will want extra things added or existing things changed over time.
This paradigm is the oldest and the most widely used approach to system development, it was developed by Royce in 1970.
CONCLUSION
This is a project for “HOTEL MANAGEMENT” it is a dummy project because due to the deficiency of actual information about Regulation.
Our Project can be extended we are unable to work more on this now because of lack of time. We will work more on it after some time we can make it useful for many other Regulation. We can add some sorting method in it. We also add some other facilities which help in it. We also can add some other facilities which help in formatting students enquiry. We can extend it for making records of marks etc. If we done this work also in our project we can sell it in market even as a self package.