29-10-2014, 02:47 PM
Abstracts: To achieve a best possible way for consuming time by which overall cost of the project will be minimized and best quality work can be achieved. In a project of construction management for a commercial building , now a days time management is biggest problem in a large site construction. Due to lack of concentration in a management of time during construction work, many of the problems may arise. Some time due to extension of construction work time the cost of the project will be increased like increased in cost of Machine , Labour cost , Material cost . Sometime due to less concentration, scheduling of the material will be disturbed. So it will become a major problem in construction management. We are going to improve management of construction work in short duration. By system of construction technique , we will introduce a best possible way for time duration management.