24-10-2014, 10:17 AM
Abstracts: •Productivity is being the most important thing in the manufacturing world. This project highlights a methodology developed for minimization of non productive activities (NVA) and minimization of time in assembly line by using Maynard’s Operation Sequence Technique (MOST) revealed the excessive movements of operators. •Work study in productivity improvement could be done in two approaches; which are method study and time study. Thus, this project will use process as the Maynard Operation Sequence Technique (MOST) as the time study method. •All this initiated by performing work study on the manual operators’ activities. This case study is being conducted at panchnath tractors. From this study, NVA activities, the standard time, utilization and recommendation for man power planning could be established. •The necessary changes were suggested in workplace to minimize the stress creating unproductive movements. These results could be used for optimization of time at the assembly. •So, the project, it is believed, would be great help to those working in the area of efficiency improvement in assembly line in company.