10-10-2014, 09:41 AM
Abstracts: 1. Project include post tensioning assemble temporary bridge using precast concrete component which can use in specific set of condition like rescue operation during natural or man-made tragedy (during flood and battle) which can assemble in minimum time (1:30 to 2:00 hours, ideal). 2. New idea:- i. Post tension assembling technique. ii. Post tensioning in arch action. 3. List of works:- i. Analysis done in STAAD pro. ii. Post tensioning design done in excel sheet. iii. I was also attend army attachment camp(15day) of NCC, Ahmedabad which is arranged by Army engineering corp. in which I was learned about temporary bridge which use by army.