10-11-2014, 02:24 PM
Abstracts: Railway over bridge in Himatnagar is an Accident prone area due to having sharp curves. It also have problem like, not proper visibility of vehicles coming from front due to sharp curves. The width of the carriageway is short for the future traffic handling. There are no signs and signals are provided on the bridgeThe other problem of this bridge is at it’s both the end points, the vehicles which are coming from the side road, which is under the bridge are not properly visible