WORK SCHEDULING
WORK SC.docx (Size: 20.68 KB / Downloads: 32)
The work to be done in the further sessions will be done as per the schedule. The work scheduling is done as per the scheduling chart shown. The numbers of days provided in the chart are tentative. The actual days may vary as per the unavailability of direct or indirect material, power failure, and machine breakdown.