04-11-2014, 02:50 PM
Abstracts: In recent time the commercial buildings are based upon R.C.C frame but they need some days for installation , so with a view point of safety and minimizing the time required we have studied of layout and construction of steel structure in congested area where there is huge rush of vehicle transportation and people. R.C.C column occupy more area in plan. They reduce the carpet area. The R.C.C work needs on site quality control. Form work is required for R.C.C work. It also takes time for curing of the work. A commercial building is situated in dariapur area of ahmedabad is studied to carry out construction work in a congested area. Also advantage and disadvantage of steel work is compared with R.C.C work.