15-10-2014, 03:10 PM
Objective of Project:
The study concerned determining the wind interference effects due to the existing chimney nearby and other nearby structures for all three locations using wind tunnel experimentation on aerodynamic model of the chimneys and rigid models of the surrounding structures
Outlay: Rs.13,22,400