23-10-2014, 01:44 PM
Abstracts: Data collected at A.P.C at V.V.Nagar are analyze to study the comparison between conventional r.c.c. method and post tensioning method of construction of beam. By comparing the design and estimation of both the method the efforts are made to give idea about which alternative is suitable for the site.