01-09-2014, 02:35 PM
SIR,I come to Maya Garden for training of 6 months in January. I did training as a site engineer . Project manager gave me J1 block of 1BHK. I work at this block afer the completion of ground floor. Then I did layout of this block colomns with in 2 days . then I did filling after casting of columns. After completed all this work the structure of 1BHK start . Again did layout of the column to check the accuracy , now these days work is reached at 7th floor and construction is going with full swing