25-08-2017, 09:32 PM
Abstracts: At sir Lakhajiraj road traffic problem is very high, so find proper solution for those we had carried out corridor improvement plan survey which also known as area improvement plan. At location, road length is 530m,road width is 13.5m. to solve the problem under corridor improvement plan we carried out various survey such as pedestrian count survey, traffic volume count survey, on/off street parking survey, road inventory survey. After collecting the survey data, we analyze those data and give solution according to these condition of road and traffic in our corridor improvement plan of sir Lakhajiraj road.