Abstracts: Total cost of the project is dependent largely on the duration of execution of the project. The aim of construction schedule is to complete the project within least cost and time. This project identifies the problems in scheduling, factors affecting the schedule and methods to overcome or minimize the problems related to construction and to optimize construction schedule and cost. The objectives of this study are to investigate the factors affecting the preparation of better construction schedule; establish the severity of these factors; and the methods of improvements for preparing better construction schedule. In conclusion, the study also identified recommendations that can be used by the project participants in order to prepare effective and good construction work schedule in the local construction industry.